(i) A written offer you to treatment the construction defect at no cost to your claimant, like a report of the scope of the inspection, the conclusions and outcomes in the inspection, an outline of the additional building essential to cure the defect described inside the claim, in addition to https://lanekzmfq.blogpixi.com/13545458/top-latest-five-excavation-claims-urban-news